Richmond Engineering Works engineered and provided turnkey installation of two (2) newly designed magnetic separators and structures.  The goal was to remove tramp iron from the incoming coal conveyor as material is transported from their REW Rotary Car Dumper to the stock yard.  The magnetic separators were designed to help protect equipment further down the line on Read more…

A complete electrical upgrade to a stacker reclaimer was accomplished at a generating station in Missouri by Richmond Engineering Works. The machine was originally built in the 1970s and was mostly using original controls, however, spare parts were becoming more difficult to obtain. With the use of new, more reliable and easier troubleshooting PLC and motor drives, Read more…

Richmond Engineering Works (REW) will be participating in the following tradeshows for 2019. We hope that you will take the time to stop in and visit with us. Our sales staff will be in the booth to assist you with any questions or needs you might have on your material handling equipment. REW offers a full range Read more…

Richmond Engineering Works (REW) has completed a Railcar Positioner Upgrade for a power station in Missouri. The project consisted of upgrading the runway foundation for the positioner carriage and rebuilding / upgrading the hydraulic and mechanical equipment on the spare positioner carriage supplied by the customer. With this upgrade, unloading times where improved from unloading a unit Read more…

It has been a busy and eventful 2017 with the installation of three new rotary car dumpers, two with end rings in and one with end rings out. One rotary car dumper included mechanical car clamps vs hydraulic car clamps which is what REW has implemented on previous rotary car dumpers. Our team traveled out West twice Read more…