Project Overview A Power Plant Facility located on the Ohio River experiences debris accumulation at their cooling water inlet. A cable winch and trash rake system was installed by the facility with brakes and clutches operated mechanically by a system of levers and foot pedals. The old system was difficult and unsafe to operate. The operator was Read more…