![]() |
|
- A new Electric House, located on the shore, will contain the new PLC, DC drives, isolation transformers and MMI station. By locating the electric house on-shore, the outage length and the installation costs will be drastically reduced. The old equipment will be abandoned in place eliminating the costly price of removal.
- New Vector Drives and Motors along with gearboxes on the barge haul system can help to increase machine throughput and help with smoother machine operation. The barge haul controls can be incorporated into the machine PLC.
- Where it is not practical or financially feasible to replace the M-G set, a new Field Control Regulator can be used to replace the obsolete field controls such as an outdated AmplidyneŽ controller.
- Reduce wiring maintenance issues by upgrading with a state-of-the art DeviceNet platform. With the installation of remote I/O and using DeviceNet Communication, multiple runs of wire are reduced to a single communication cable.
Need additional information about Clamshell/Grab Unloader Upgrades and design services? Please feel free to contact us, our staff will be happy to assist you!




